Skip to main content
Home page
Site map
Search
Contact Us
Before
After
Before
After
Click to enlarge

South Hunsley School have had repairs done by Protech Allweather in the past so we were pleased to provide them with a prompt service as part of our 24 hour call out promise. The penalty spot had been damaged and needed repairing as quickly as possible to avoid any loss of revenue from lettings.

Also shown is a seam repair that was done on the pitch, where frost had got into the join, expanded and caused the seam to split. The seam is glued back into place to prevent a tripping hazard and any further damage occurring to the surface.

© Protech AllWeather Ltd 2012
|
|
|
|
Created by Studio-40